residential Under Construction Source: rera.ka

Sobha Crystal Meadows RERA Details - PRM/KA/RERA/1251/446/PR/280324/006737 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Sobha Crystal Meadows under registration PRM/KA/RERA/1251/446/PR/280324/006737 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/446/PR/280324/006737
  • Project Name SOBHA Crystal Meadows Phase 5 Wing 16 to 22
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Bengaluru East
  • Original Completion 31 December 2035
  • Documents 140 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 August 2024 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2035 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

SOBHA LIMITED
Registered Address Sobha Limited Sarjapur-Marthahalli Outer Ring Road,Bellandur Post, Bangalore - 560103 ,Bengaluru East ,Bengaluru Urban-560103
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Survey nos 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 80/5, 80/6, 81/1-81/11, 82/1, , 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) Situated at Mullur village, Varthur Hobli, Bangalore East Taluk , Bengaluru East , Bengaluru Urban, Karnataka - 560035

RERA Coordinates

Latitude, Longitude 12.90693, 77.7187
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BDA/NM/AS/AA-1/TS-4/E/62/2023-24
Authority BDA - Bangalore Development Authority
Approved Date 11 March 2024

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
W 16,17,18,19,20,21,22 0 4 0 180 Residential 12.025 3 93

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
4 BHK 0 units
NA 0 units
  • W 16,17,18,19,20,21,22
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 4 BHK 3092.4972 B9-101
-1 4 BHK 3092.4972 B5-102
-1 4 BHK 3092.4972 B5-103
-1 4 BHK 3092.4972 B7-104
-1 4 BHK 3092.4972 B6-105
-1 4 BHK 3092.4972 B5-106
-1 4 BHK 3092.4972 B12-107
-1 4 BHK 3132.96984 A2-108
-1 4 BHK 3137.27544 A1-109
-1 4 BHK 3087.76104 B11-110
-1 4 BHK 3087.76104 B1-111
-1 4 BHK 3087.76104 B1-112
-1 4 BHK 3087.76104 B1-113
-1 4 BHK 3087.76104 B1-114
-1 4 BHK 3087.76104 B2-115
-1 4 BHK 3087.76104 B3-116
-1 4 BHK 3087.76104 B1-117
-1 4 BHK 3087.76104 B1-118
-1 4 BHK 3087.76104 B1-119
-1 4 BHK 3087.76104 B1-120
-1 4 BHK 3087.76104 B4-121
-1 4 BHK 3092.4972 B9-201
-1 4 BHK 3092.4972 B5-202
-1 4 BHK 3092.4972 B5-203
-1 4 BHK 3092.4972 B5-204
-1 4 BHK 3092.4972 B5-205
-1 4 BHK 3092.4972 B7-206
-1 4 BHK 3092.4972 B6-207
-1 4 BHK 3092.4972 B5-208
-1 4 BHK 3092.4972 B5-209
-1 4 BHK 3092.4972 B5-210
-1 4 BHK 3092.4972 B5-211
-1 4 BHK 3092.4972 B12-212
-1 4 BHK 3132.96984 A2-213
-1 4 BHK 3137.27544 A1-214
-1 4 BHK 3087.76104 B11-215
-1 4 BHK 3087.76104 B1-216
-1 4 BHK 3087.76104 B1-217
-1 4 BHK 3087.76104 B1-218
-1 4 BHK 3087.76104 B1-219
-1 4 BHK 3087.76104 B2-220
-1 4 BHK 3087.76104 B3-221
-1 4 BHK 3087.76104 B1-222
-1 4 BHK 3087.76104 B1-223
-1 4 BHK 3087.76104 B1-224
-1 4 BHK 3087.76104 B1-225
-1 4 BHK 3087.76104 B4-226
-1 4 BHK 3092.4972 B9-301
-1 4 BHK 3092.4972 B5-302
-1 4 BHK 3092.4972 B5-303
-1 4 BHK 3092.4972 B5-304
-1 4 BHK 3092.4972 B5-305
-1 4 BHK 3092.4972 B7-306
-1 4 BHK 3092.4972 B6-307
-1 4 BHK 3092.4972 B5-308
-1 4 BHK 3092.4972 B5-309
-1 4 BHK 3092.4972 B5-310
-1 4 BHK 3092.4972 B5-311
-1 4 BHK 3092.4972 B12-312
-1 4 BHK 3132.96984 A2-313
-1 4 BHK 3137.27544 A1-314
-1 4 BHK 3087.76104 B11-315
-1 4 BHK 3087.76104 B1-316
-1 4 BHK 3087.76104 B1-317
-1 4 BHK 3087.76104 B1-318
-1 4 BHK 3087.76104 B1-319
-1 4 BHK 3087.76104 B2-320
-1 4 BHK 3087.76104 B3-321
-1 4 BHK 3087.76104 B1-322
-1 4 BHK 3087.76104 B1-323
-1 4 BHK 3087.76104 B1-324
-1 4 BHK 3087.76104 B1-325
-1 4 BHK 3087.76104 B4-326
-1 4 BHK 3092.4972 B9-401
-1 4 BHK 3092.4972 B5-402
-1 4 BHK 3092.4972 B5-403
-1 4 BHK 3092.4972 B5-404
-1 4 BHK 3092.4972 B5-405
-1 4 BHK 3092.4972 B7-406
-1 4 BHK 3092.4972 B6-407
-1 4 BHK 3092.4972 B5-408
-1 4 BHK 3092.4972 B5-409
-1 4 BHK 3092.4972 B5-410
-1 4 BHK 3092.4972 B5-411
-1 4 BHK 3092.4972 B12-412
-1 4 BHK 3132.96984 A2-413
GF NA 303.22188 A2'-108
GF NA 303.5448 A1'-109
GF NA 303.22188 A2'-213
GF NA 303.5448 A1'-214
GF NA 303.22188 A2'-313
GF NA 303.5448 A1'-314
GF NA 303.22188 A2'-413
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
1 Completion Certificate
2 Completion Certificate
4 Completion Certificate
8 Completion Certificate
9 Completion Certificate
11 Completion Certificate
15 Completion Certificate
16 Completion Certificate
18 Completion Certificate
22 Completion Certificate
23 Completion Certificate
28 Completion Certificate
29 Completion Certificate
30 Completion Certificate
31 Completion Certificate
34 Completion Certificate
35 Completion Certificate
36 Completion Certificate
37 Completion Certificate
41 Completion Certificate
42 Completion Certificate
49 Completion Certificate
52 Completion Certificate
54 Completion Certificate
55 Completion Certificate
56 Completion Certificate
58 Completion Certificate
59 Completion Certificate
65 Completion Certificate
67 Completion Certificate
68 Completion Certificate
72 Completion Certificate
74 Completion Certificate
75 Completion Certificate
76 Completion Certificate
77 Completion Certificate
79 Completion Certificate
80 Completion Certificate
81 Completion Certificate
82 Completion Certificate
83 Completion Certificate
86 Completion Certificate
Fd 1 Balance Sheet Mar 2023.Pdf
Fd 2 Balance Sheet Mar 2022.Pdf
Fd 3 Balance Sheet Mar 2021.Pdf
Fd 4 Profit Loss Statement Mar 2023.Pdf
Fd 5 Profit Loss Statement Mar 2022.Pdf
Fd 6 Profit Loss Statement Mar 2021.Pdf
Fd 7 DR 2022 23.Pdf
Fd 8 DR 2021 22.Pdf
Fd 9 DR 2020 21.Pdf
Fd 10 Cash Flow Mar 2023.Pdf
Fd 11 Cash Flow Mar 2022.Pdf
Fd 12 Cash Flow Mar 2021.Pdf
Fd 13 Auditors Report Mar 2023 C1.Pdf
Fd 14 Auditors Report Mar 2022.Pdf
Fd 15 Auditors Report Mar 2021.Pdf
Fd 16 ITR AY 2023 24.Pdf
Fd 17 ITR AY 2022 23.Pdf
Fd 18 ITR AY 2021 22.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 3 Approval NOC Under Section 109 Of KLR Act 1961( Annexure - 95 )
Noc 4 Approval NOC Under Section 14 Of The KTCP Act( Annexure - 96 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Noc 9 BSNL( Annexure - 101 )
Noc 10 Lift Authorities( Annexure - 102 )
Noc 11 BMRCL( Annexure - 103 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 Page 3 Respondent Names.Pdf
Od 2 STP Layout And Tech Writup.Pdf
Od 3 Mullur Guideline Value.Pdf
Od 4 MULLUR VILLAGE MAP.Pdf
Od 5 DP And DP Work Order.Pdf
Od 6 Akarband.Pdf
Od 7 Sketch Mullur.Pdf
Od 8 SCM Carpet Area.Pdf
Od 9 PHASE 5 Floor Plans.Pdf
Od 10 Affidavit On Litigation Ph5.Pdf
Od 11 Hissa Phodi Copy C.Pdf
Od 12 Any Other Docs Part 2 Of 6 C.Pdf
Od 13 Any Other Docs Part 3 Of 6 C1.Pdf
Od 14 Any Other Docs Part 4 Of 6 C.Pdf
Od 15 Any Other Docs Part 5 Of 6 C.Pdf
Od 16 Any Other Docs Part 6 Of 6 C.Pdf
Od 17 Advocate Search Report Part2 Of 2.Pdf
Ed 1 14-03-2024
Ed 2 14-03-2024
Ed 3 14-03-2024
Ed 4 14-03-2024
Ed 5 14-03-2024
Ed 6 14-03-2024
Ed 7 14-03-2024
Ed 8 14-03-2024
Ed 9 14-03-2024
Ed 10 14-03-2024
Ed 11 14-03-2024
Ed 12 14-03-2024
Ed 13 14-03-2024
Ed 14 14-03-2024
Ed 15 14-03-2024
Ed 16 14-03-2024
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Axis Bank
Account Number (RERA) 923020012829877
IFSC UTIB0000009
Branch Address MG Road, Bangalore
Country/City