Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Partially Ready To Move Source: rera.ka

Sobha Dream Gardens RERA Details - PRM/KA/RERA/1251/309/PR/311222/005591 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Sobha Dream Gardens under registration PRM/KA/RERA/1251/309/PR/311222/005591 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/309/PR/311222/005591
  • Project Name Sobha Dream Gardens Phase 5 - Wing 10
  • Project Type Residential/Group Housing
  • Project Status Partially Ready To Move
  • District Bengaluru Urban
  • Taluka Bengaluru North
  • Original Completion 31 December 2028
  • Documents 121 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 October 2023 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2028 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

SOBHA LIMITED
Registered Address Sobha Limited Sarjapur-Marthahalli Outer Ring Road,Bellandur Post, Bangalore - 560103 ,Bengaluru East ,Bengaluru Urban-560103
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Survey No. 50, 51 & 54, Belahalli Village , Yelahanka Hobli , Bengaluru North , Bengaluru Urban, Karnataka - 560056

RERA Coordinates

Latitude, Longitude 13.09904167, 77.64150278
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BBMP/Addl.Dir/JD North/LP/0009/2018-19
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 01 October 2018

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Wing 10 1 18 0 142 Residential 54.4 17 142

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
2 BHK 0 units
  • Wing 10
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 2 BHK 58.28 10002
-1 1 BHK 38.29 10003
-1 1 BHK 38.29 10004
-1 1 BHK 38.29 10005
-1 1 BHK 38.29 10006
-1 2 BHK 58.28 10007
GF 1 BHK 41.16 10011
GF 2 BHK 58.28 10012
GF 1 BHK 38.29 10013
GF 1 BHK 38.29 10014
GF 1 BHK 38.29 10015
GF 1 BHK 38.29 10016
GF 2 BHK 58.28 10017
GF 1 BHK 41.16 10018
1 2 BHK 58.28 10021
1 2 BHK 58.28 10022
1 1 BHK 38.29 10023
1 1 BHK 38.29 10024
1 1 BHK 38.29 10025
1 1 BHK 38.29 10026
1 2 BHK 58.28 10027
1 2 BHK 58.28 10028
2 2 BHK 58.28 10031
2 2 BHK 58.28 10032
2 1 BHK 38.29 10033
2 1 BHK 38.29 10034
2 1 BHK 38.29 10035
2 1 BHK 38.29 10036
2 2 BHK 58.28 10037
2 2 BHK 58.28 10038
3 2 BHK 58.28 10041
3 2 BHK 58.28 10042
3 1 BHK 38.29 10043
3 1 BHK 38.29 10044
3 1 BHK 38.29 10045
3 1 BHK 38.29 10046
3 2 BHK 58.28 10047
3 2 BHK 58.28 10048
4 2 BHK 58.28 10051
4 2 BHK 58.28 10052
4 1 BHK 38.29 10053
4 1 BHK 38.29 10054
4 1 BHK 38.29 10055
4 1 BHK 38.29 10056
4 2 BHK 58.28 10057
4 2 BHK 58.28 10058
5 2 BHK 58.28 10061
5 2 BHK 58.28 10062
5 1 BHK 38.29 10063
5 1 BHK 38.29 10064
5 1 BHK 38.29 10065
5 1 BHK 38.29 10066
5 2 BHK 58.28 10067
5 2 BHK 58.28 10068
6 2 BHK 58.28 10071
6 2 BHK 58.28 10072
6 1 BHK 38.29 10073
6 1 BHK 38.29 10074
6 1 BHK 38.29 10075
6 1 BHK 38.29 10076
6 2 BHK 58.28 10077
6 2 BHK 58.28 10078
7 2 BHK 58.28 10081
7 2 BHK 58.28 10082
7 1 BHK 38.29 10083
7 1 BHK 38.29 10084
7 1 BHK 38.29 10085
7 1 BHK 38.29 10086
7 2 BHK 58.28 10087
7 2 BHK 58.28 10088
8 2 BHK 58.28 10091
8 2 BHK 58.28 10092
8 1 BHK 38.29 10093
8 1 BHK 38.29 10094
8 1 BHK 38.29 10095
8 1 BHK 38.29 10096
8 2 BHK 58.28 10097
8 2 BHK 58.28 10098
9 2 BHK 58.28 10101
9 2 BHK 58.28 10102
9 1 BHK 38.29 10103
9 1 BHK 38.29 10104
9 1 BHK 38.29 10105
9 1 BHK 38.29 10106
9 2 BHK 58.28 10107
9 2 BHK 58.28 10108
10 2 BHK 58.28 10111
10 2 BHK 58.28 10112
10 1 BHK 38.29 10113
10 1 BHK 38.29 10114
10 1 BHK 38.29 10115
10 1 BHK 38.29 10116
10 2 BHK 58.28 10117
10 2 BHK 58.28 10118
11 2 BHK 58.28 10121
11 2 BHK 58.28 10122
11 1 BHK 38.29 10123
11 1 BHK 38.29 10124
11 1 BHK 38.29 10125
11 1 BHK 38.29 10126
11 2 BHK 58.28 10127
11 2 BHK 58.28 10128
12 2 BHK 58.28 10131
12 2 BHK 58.28 10132
12 1 BHK 38.29 10133
12 1 BHK 38.29 10134
12 1 BHK 38.29 10135
12 1 BHK 38.29 10136
12 2 BHK 58.28 10137
12 2 BHK 58.28 10138
13 2 BHK 58.28 10141
13 2 BHK 58.28 10142
13 1 BHK 38.29 10143
13 1 BHK 38.29 10144
13 1 BHK 38.29 10145
13 1 BHK 38.29 10146
13 2 BHK 58.28 10147
13 2 BHK 58.28 10148
14 2 BHK 58.28 10151
14 2 BHK 58.28 10152
14 1 BHK 38.29 10153
14 1 BHK 38.29 10154
14 1 BHK 38.29 10155
14 1 BHK 38.29 10156
14 2 BHK 58.28 10157
14 2 BHK 58.28 10158
15 2 BHK 58.28 10161
15 2 BHK 58.28 10162
15 1 BHK 38.29 10163
15 1 BHK 38.29 10164
15 1 BHK 38.29 10165
15 1 BHK 38.29 10166
15 2 BHK 58.28 10167
15 2 BHK 58.28 10168
16 2 BHK 58.28 10171
16 2 BHK 58.28 10172
16 1 BHK 38.29 10173
16 1 BHK 38.29 10174
16 1 BHK 38.29 10175
16 1 BHK 38.29 10176
16 2 BHK 58.28 10177
16 2 BHK 58.28 10178
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
1 Completion Certificate
5 Completion Certificate
6 Completion Certificate
9 Completion Certificate
10 Completion Certificate
11 Completion Certificate
13 Completion Certificate
14 Completion Certificate
19 Completion Certificate
21 Completion Certificate
26 Completion Certificate
28 Completion Certificate
31 Completion Certificate
32 Completion Certificate
33 Completion Certificate
34 Completion Certificate
37 Completion Certificate
39 Completion Certificate
41 Completion Certificate
44 Completion Certificate
45 Completion Certificate
46 Completion Certificate
50 Completion Certificate
51 Completion Certificate
52 Completion Certificate
54 Completion Certificate
56 Completion Certificate
57 Completion Certificate
60 Completion Certificate
62 Completion Certificate
64 Completion Certificate
66 Completion Certificate
68 Completion Certificate
70 Completion Certificate
71 Completion Certificate
72 Completion Certificate
73 Completion Certificate
76 Completion Certificate
78 Completion Certificate
Fd 1 Balance Sheet Mar 2022.Pdf
Fd 2 Balance Sheet Mar 2021.Pdf
Fd 3 Balance Sheet Mar 2020.Pdf
Fd 4 Profit Loss Statement Mar 2022.Pdf
Fd 5 Profit Loss Statement Mar 2021.Pdf
Fd 6 Profit Loss Statement Mar 2020.Pdf
Fd 7 DR 2021 22.Pdf
Fd 8 DR 2020 21.Pdf
Fd 9 DR 2019 20.Pdf
Fd 10 Cash Flow Mar 2022.Pdf
Fd 11 Cash Flow Mar 2021.Pdf
Fd 12 Cash Flow Mar 2020.Pdf
Fd 13 Auditors Report Mar 2022.Pdf
Fd 14 Auditors Report Mar 2021.Pdf
Fd 15 Auditors Report Mar 2020.Pdf
Fd 16 ITR AY 2021 22.Pdf
Fd 17 ITR AY 2020 21.Pdf
Fd 18 ITR AY 2019 20.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 3 Approval NOC Under Section 109 Of KLR Act 1961( Annexure - 95 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Noc 9 BSNL( Annexure - 101 )
Noc 11 BMRCL( Annexure - 103 )
Noc 12 NOC In Case Of Building Proposals Abutting To Neighbouring Properties( Annexure - 104 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 51 Development Plan And WO.Pdf
Od 2 Bellahalli Guideline Value.Pdf
Od 3 DG Approved Plans C.Pdf
Od 4 Fire NOC And Fee Receipt.Pdf
Od 5 Village Map Demarcated.Png
Od 6 CDP For Bellahalli.Jpg
Ed 1 09-11-2022
Ed 2 09-11-2022
Ed 3 09-11-2022
Ed 4 09-11-2022
Ed 5 09-11-2022
Ed 6 09-11-2022
Ed 7 09-11-2022
Ed 8 09-11-2022
Ed 9 09-11-2022
Ed 10 28-11-2022
Ed 11 28-11-2022
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank RATNAKAR BANK
Account Number (RERA) 409002401479
IFSC RATN0000156
Branch Address PRESTIGE TOWERS, ( 0156 ) GROUND FLOOR, G-13, G-14, G-15 AND G-17, PRESTIGE TOWERS, 99, 100 RESIDENCY ROAD, BANGALORE
Country/City