Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Partially Ready To Move Source: rera.ka

Sobha Dream Gardens RERA Details - PRM/KA/RERA/1251/309/PR/311222/005593 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Sobha Dream Gardens under registration PRM/KA/RERA/1251/309/PR/311222/005593 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/309/PR/311222/005593
  • Project Name Sobha Dream Gardens Phase 3 - Wing 3 and 4
  • Project Type Residential/Group Housing
  • Project Status Partially Ready To Move
  • District Bengaluru Urban
  • Taluka Bengaluru North
  • Original Completion 31 December 2027
  • Documents 115 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 January 2023 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2027 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

SOBHA LIMITED
Registered Address Sobha Limited Sarjapur-Marthahalli Outer Ring Road,Bellandur Post, Bangalore - 560103 ,Bengaluru East ,Bengaluru Urban-560103
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Survey No. 50, 51 & 54, Belahalli Village , Yelahanka Hobli , Bengaluru North , Bengaluru Urban, Karnataka - 560056

RERA Coordinates

Latitude, Longitude 13.09904167, 77.64150278
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BBMP/Addl.Dir/JD North/0009/2018-19
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 01 October 2018

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Wing 3 1 24 0 182 Residential 75.1 23 182
Wing 4 1 24 0 182 Residential 75.1 23 182

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
2 BHK 0 units
  • Wing 3
  • Wing 4
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 2 BHK 58.28 3012
GF 2 BHK 58.28 3013
GF 2 BHK 58.28 3014
GF 2 BHK 58.28 3015
GF 2 BHK 58.28 3016
GF 2 BHK 58.28 3017
1 1 BHK 41.16 3021
1 2 BHK 58.28 3022
1 2 BHK 58.28 3023
1 2 BHK 58.28 3024
1 2 BHK 58.28 3025
1 2 BHK 58.28 3026
1 2 BHK 58.28 3027
1 1 BHK 41.16 3028
2 2 BHK 58.28 3031
2 2 BHK 58.28 3032
2 2 BHK 58.28 3033
2 2 BHK 58.28 3034
2 2 BHK 58.28 3035
2 2 BHK 58.28 3036
2 2 BHK 58.28 3037
2 2 BHK 58.28 3038
3 2 BHK 58.28 3041
3 2 BHK 58.28 3042
3 2 BHK 58.28 3043
3 2 BHK 58.28 3044
3 2 BHK 58.28 3045
3 2 BHK 58.28 3046
3 2 BHK 58.28 3047
3 2 BHK 58.28 3048
4 2 BHK 58.28 3051
4 2 BHK 58.28 3052
4 2 BHK 58.28 3053
4 2 BHK 58.28 3054
4 2 BHK 58.28 3055
4 2 BHK 58.28 3056
4 2 BHK 58.28 3057
4 2 BHK 58.28 3058
5 2 BHK 58.28 3061
5 2 BHK 58.28 3062
5 2 BHK 58.28 3063
5 2 BHK 58.28 3064
5 2 BHK 58.28 3065
5 2 BHK 58.28 3066
5 2 BHK 58.28 3067
5 2 BHK 58.28 3068
6 2 BHK 58.28 3071
6 2 BHK 58.28 3072
6 2 BHK 58.28 3073
6 2 BHK 58.28 3074
6 2 BHK 58.28 3075
6 2 BHK 58.28 3076
6 2 BHK 58.28 3077
6 2 BHK 58.28 3078
7 2 BHK 58.28 3081
7 2 BHK 58.28 3082
7 2 BHK 58.28 3083
7 2 BHK 58.28 3084
7 2 BHK 58.28 3085
7 2 BHK 58.28 3086
7 2 BHK 58.28 3087
7 2 BHK 58.28 3088
8 2 BHK 58.28 3091
8 2 BHK 58.28 3092
8 2 BHK 58.28 3093
8 2 BHK 58.28 3094
8 2 BHK 58.28 3095
8 2 BHK 58.28 3096
8 2 BHK 58.28 3097
8 2 BHK 58.28 3098
9 2 BHK 58.28 3101
9 2 BHK 58.28 3102
9 2 BHK 58.28 3103
9 2 BHK 58.28 3104
9 2 BHK 58.28 3105
9 2 BHK 58.28 3106
9 2 BHK 58.28 3107
9 2 BHK 58.28 3108
10 2 BHK 58.28 3111
10 2 BHK 58.28 3112
10 2 BHK 58.28 3113
10 2 BHK 58.28 3114
10 2 BHK 58.28 3115
10 2 BHK 58.28 3116
10 2 BHK 58.28 3117
10 2 BHK 58.28 3118
11 2 BHK 58.28 3121
11 2 BHK 58.28 3122
11 2 BHK 58.28 3123
11 2 BHK 58.28 3124
11 2 BHK 58.28 3125
11 2 BHK 58.28 3126
11 2 BHK 58.28 3127
11 2 BHK 58.28 3128
12 2 BHK 58.28 3131
12 2 BHK 58.28 3132
12 2 BHK 58.28 3133
12 2 BHK 58.28 3134
12 2 BHK 58.28 3135
12 2 BHK 58.28 3136
12 2 BHK 58.28 3137
12 2 BHK 58.28 3138
13 2 BHK 58.28 3141
13 2 BHK 58.28 3142
13 2 BHK 58.28 3143
13 2 BHK 58.28 3144
13 2 BHK 58.28 3145
13 2 BHK 58.28 3146
13 2 BHK 58.28 3147
13 2 BHK 58.28 3148
14 2 BHK 58.28 3151
14 2 BHK 58.28 3152
14 2 BHK 58.28 3153
14 2 BHK 58.28 3154
14 2 BHK 58.28 3155
14 2 BHK 58.28 3156
14 2 BHK 58.28 3157
14 2 BHK 58.28 3158
15 2 BHK 58.28 3161
15 2 BHK 58.28 3162
15 2 BHK 58.28 3163
15 2 BHK 58.28 3164
15 2 BHK 58.28 3165
15 2 BHK 58.28 3166
15 2 BHK 58.28 3167
15 2 BHK 58.28 3168
16 2 BHK 58.28 3171
16 2 BHK 58.28 3172
16 2 BHK 58.28 3173
16 2 BHK 58.28 3174
16 2 BHK 58.28 3175
16 2 BHK 58.28 3176
16 2 BHK 58.28 3177
16 2 BHK 58.28 3178
17 2 BHK 58.28 3181
17 2 BHK 58.28 3182
17 2 BHK 58.28 3183
17 2 BHK 58.28 3184
17 2 BHK 58.28 3185
17 2 BHK 58.28 3186
17 2 BHK 58.28 3187
17 2 BHK 58.28 3188
18 2 BHK 58.28 3191
18 2 BHK 58.28 3192
18 2 BHK 58.28 3193
18 2 BHK 58.28 3194
18 2 BHK 58.28 3195
18 2 BHK 58.28 3196
18 2 BHK 58.28 3197
18 2 BHK 58.28 3198
19 2 BHK 58.28 3201
19 2 BHK 58.28 3202
19 2 BHK 58.28 3203
19 2 BHK 58.28 3204
19 2 BHK 58.28 3205
19 2 BHK 58.28 3206
19 2 BHK 58.28 3207
19 2 BHK 58.28 3208
20 2 BHK 58.28 3211
20 2 BHK 58.28 3212
20 2 BHK 58.28 3213
20 2 BHK 58.28 3214
20 2 BHK 58.28 3215
20 2 BHK 58.28 3216
20 2 BHK 58.28 3217
20 2 BHK 58.28 3218
21 2 BHK 58.28 3221
21 2 BHK 58.28 3222
21 2 BHK 58.28 3223
21 2 BHK 58.28 3224
21 2 BHK 58.28 3225
21 2 BHK 58.28 3226
21 2 BHK 58.28 3227
21 2 BHK 58.28 3228
22 2 BHK 58.28 3231
22 2 BHK 58.28 3232
22 2 BHK 58.28 3233
22 2 BHK 58.28 3234
22 2 BHK 58.28 3235
22 2 BHK 58.28 3236
22 2 BHK 58.28 3237
22 2 BHK 58.28 3238
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
1 Completion Certificate
4 Completion Certificate
6 Completion Certificate
10 Completion Certificate
11 Completion Certificate
14 Completion Certificate
17 Completion Certificate
20 Completion Certificate
22 Completion Certificate
23 Completion Certificate
29 Completion Certificate
30 Completion Certificate
34 Completion Certificate
38 Completion Certificate
43 Completion Certificate
45 Completion Certificate
46 Completion Certificate
47 Completion Certificate
48 Completion Certificate
50 Completion Certificate
51 Completion Certificate
52 Completion Certificate
56 Completion Certificate
57 Completion Certificate
58 Completion Certificate
60 Completion Certificate
61 Completion Certificate
62 Completion Certificate
63 Completion Certificate
64 Completion Certificate
67 Completion Certificate
68 Completion Certificate
70 Completion Certificate
71 Completion Certificate
72 Completion Certificate
77 Completion Certificate
78 Completion Certificate
79 Completion Certificate
81 Completion Certificate
Fd 1 Balance Sheet Mar 2022.Pdf
Fd 2 Balance Sheet Mar 2021.Pdf
Fd 3 Balance Sheet Mar 2020.Pdf
Fd 4 Profit Loss Statement Mar 2022.Pdf
Fd 5 Profit Loss Statement Mar 2021.Pdf
Fd 6 Profit Loss Statement Mar 2020.Pdf
Fd 7 DR 2021 22.Pdf
Fd 8 DR 2020 21.Pdf
Fd 9 DR 2019 20.Pdf
Fd 10 Cash Flow Mar 2022.Pdf
Fd 11 Cash Flow Mar 2021.Pdf
Fd 12 Cash Flow Mar 2020.Pdf
Fd 13 Auditors Report Mar 2022.Pdf
Fd 14 Auditors Report Mar 2021.Pdf
Fd 15 Auditors Report Mar 2020.Pdf
Fd 16 ITR AY 2021 22.Pdf
Fd 17 ITR AY 2020 21.Pdf
Fd 18 ITR AY 2019 20.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 3 Approval NOC Under Section 109 Of KLR Act 1961( Annexure - 95 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Noc 9 BSNL( Annexure - 101 )
Noc 11 BMRCL( Annexure - 103 )
Noc 12 NOC In Case Of Building Proposals Abutting To Neighbouring Properties( Annexure - 104 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 Bellahalli Guideline Value.Pdf
Od 2 Village Map Demarcated.Png
Od 3 SDG Approved Plans.Pdf
Od 4 DG STP Layout And Technical Writ Up.Pdf
Od 5 Fire NOC And Fee Receipt.Pdf
Od 6 51 Development Plan And WO.Pdf
Ed 1 09-11-2022
Ed 2 09-11-2022
Ed 3 09-11-2022
Ed 4 09-11-2022
Ed 5 30-11-2022
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Axis Bank
Account Number (RERA) 922020044782246
IFSC UTIB0000009
Branch Address Axis Bank M,G Road
Country/City