What’s new in Rau Pitampur Road, Indore? Recent & Future Developments
Last Update: 21 Apr 2026
21 Apr2026
Indore-Pithampur Economic Corridor Phase 1 Infrastructure Work to Commence
The first phase of infrastructure development for the proposed 19.60 km Indore-Pithampur economic corridor is set to begin with an estimated cost of over Rs 250 crore. This project aims to strengthen one of central India's largest manufacturing belts by developing road networks, drainage, and electricity infrastructure
Source: The Times of India
30 Mar2026
New Terminal-1 at Indore Airport Inaugurated, Boosting Regional Connectivity
Madhya Pradesh Chief Minister Mohan Yadav inaugurated the new Terminal-1 at Devi Ahilyabai Holkar Airport in Indore. The renovated terminal, costing around ₹50 crore, is expected to significantly enhance passenger amenities and increase the airport's annual handling capacity. This development aims to boost regional connectivity and promote tourism, trade, and economic growth across the state.
Source: The Times of India
02 Mar2026
Indore-Pithampur Economic Corridor Phase 1 Begins, Aims to Boost Manufacturing
The first phase of infrastructure development for the 19.60 km Indore-Pithampur economic corridor has commenced with an investment of over ₹250 crore. This project aims to strengthen central India's manufacturing belt by developing road networks, drainage, and electricity infrastructure. The corridor is projected to ease freight movement, reduce travel time between Indore and Pithampur, and attract fresh investments.
Source: The Economic Times, Free Press Journal
Check Travel Time from Rau Pitampur Road to Major Areas in Indore
Please Select the Starting Point to calculate the travel time