The Manisha Garnala underpass near Utran Railway Station will be closed for vehicular movement from May 20 to July 1 for bridge expansion work as part of the Utran satellite station development project. This closure pertains to Bridge No. 454, which is a waterway drain being expanded by Western Railway.
- Home
- Property in Surat
- Property in Nana Varachha, Surat
- Nana Varachha
- Average Sale Price ₹ 3,350/Sq. Ft.
What’s new in Nana Varachha, Surat? Recent & Future Developments
Last Update: 20 May 2026
20 May2026
Utran Underpass Closure for Bridge Expansion Begins May 20
Source: The Times of India
30 Mar2026
Surat Metro Trial Run Begins on 8.5 km Stretch
The trial run for the Surat Metro has commenced on an 8.5 km viaduct between Dream City and Althan Tenament. This marks a significant step in strengthening the city's urban transport infrastructure. The trial phase will involve approximately 500 hours of train operation to ensure performance, reliability, and safety before passenger services begin.
Source: SocialNews.XYZ, The Indian Express
01 Dec2025
Surat Civic Body Demolishes Encroachments Under Varachha Flyover Following Drug Activity Concerns
The Surat Municipal Corporation (SMC) carried out an anti-encroachment drive, demolishing illegal structures and evicting over 250 people living under the Varachha flyover. This action was prompted by concerns over alleged illegal drug activities in the area, following a viral video and a letter from a local MLA.
Source: The Indian Express
Check Travel Time from Nana Varachha to Major Areas in Surat
Please Select the Starting Point to calculate the travel time